Office of the Auditor-General New Zealand
Advanced Search…

Navigation

  • About us
  • Media centre
  • Publications
  • Good practice
You are here:
  1. Home
  2. 2011 publications
  3. Transpower New Zealand Limited: Managing risks to transmission assets
  4. docs
Contents
  • Transpower New Zealand Limited: Managing risks to transmission assets
    • Our recommendations
    • Part 1: Introduction
    • Part 2: The current system for managing risks to grid assets
    • Part 3: Building the grid's capacity
    • Part 4: Making the grid more reliable
    • Appendix 1: The regulatory framework
    • Appendix 2: Transpower's framework for managing risk
    • Appendix 3: Grid Upgrade Plan approvals
    • docs
      • Transpower New Zealand Limited: Managing risks to transmission assets
  • email
  • facebook
  • twitter
  • linkedin
  • google+
  • tumblr
docs https://oag.parliament.nz/2011/transpower/docs https://oag.parliament.nz/@@site-logo/logo.png

docs

Transpower New Zealand Limited: Managing risks to transmission assets

PDF file, 54 pages, 3.1MB.

Publishing details

CoverTranspower New Zealand Limited: Managing risks to transmission assets

ISBN 978-0-478-38324-9 (print)
ISBN 978-0-478-38325-6(online)

PDF (3.07MB, 54 pages)
Filed under:
  • 2011/12
  • Performance audit
  • Asset management

Your feedback helps to ensure that we provide you with clear and useful information. Have we done that?

Leave Feedback

  • contact us
  • audit new zealand
  • site map
  • accessibility
  • privacy statement
  • auditors' homepage (auditors only)
  • Office of the Auditor-General, 100 Molesworth Street, Thorndon, Wellington 6011 | +64 4 917 1500 | enquiry@oag.parliament.nz
  • © crown copyright 2001-2022