Table 1
Carriageway information requirements checked in the Road Asset and Maintenance Management database
Carriageway section information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Lane width |
2099 |
1236 |
58.9 |
Reserve width |
2099 |
823 |
39.2 |
Traffic count |
2099 |
1511 |
72.0 |
Traffic estimate |
2099 |
378 |
18.0 |
NAASRA values* |
2099 |
595 |
28.3 |
Date added |
2099 |
125 |
6.0 |
Added by |
2099 |
898 |
42.8 |
Left lane/right lane |
2099 |
1878 |
89.5 |
* NAASRA values are based on the National Association of Australian State Roading Authorities' method for measuring road roughness.
Table 2
Carriageway surface information requirements checked in the Road Asset and Maintenance Management database
Carriageway surface table information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Removed |
1399 |
1367 |
97.7 |
Surface width |
1399 |
44 |
3.1 |
Design life |
1399 |
438 |
31.3 |
Default life |
1399 |
29 |
2.1 |
Modified life |
1399 |
28 |
2.0 |
Size of "second chip" |
1399 |
1131 |
80.8 |
Source |
1399 |
84 |
6.0 |
Cutter type |
1399 |
622 |
44.5 |
Adhesion type |
1399 |
638 |
45.6 |
Additive type |
1399 |
1313 |
93.9 |
Polymer percentage |
1399 |
1377 |
98.4 |
Elastic recovery |
1399 |
1398 |
99.9 |
Softening point |
1399 |
1384 |
98.9 |
Residual rate |
1399 |
488 |
34.9 |
Sealed area |
1399 |
587 |
42.0 |
Contract number |
1399 |
1067 |
76.3 |
Specification |
1399 |
1152 |
82.3 |
Polished stone value |
1399 |
943 |
67.4 |
ALD* |
1399 |
1083 |
77.4 |
Component |
1399 |
1392 |
99.5 |
Reason |
1399 |
1302 |
93.1 |
Notes |
1399 |
837 |
59.8 |
Added by |
1399 |
378 |
27.0 |
Changed by |
1399 |
384 |
27.4 |
* Average Least Dimension of the sealing chip or the smallest face of a piece of chip.
Table 3
Pavement layer information requirements checked in the Road Asset and Maintenance Management database
Pavement layer table information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Removed date |
1167 |
1166 |
99.9 |
Offset |
1167 |
68 |
5.8 |
Width |
1167 |
68 |
5.8 |
Layer strength |
1167 |
1053 |
90.2 |
Thickness |
1167 |
73 |
6.3 |
Source |
1167 |
58 |
5.0 |
Specification |
1167 |
1104 |
94.6 |
Plan number |
1167 |
1143 |
97.9 |
Life |
1167 |
1109 |
95.0 |
Design ESA* |
1167 |
1130 |
96.8 |
Forward works treatment |
1167 |
1160 |
99.4 |
Notes |
1167 |
474 |
40.6 |
Added by |
1167 |
17 |
1.5 |
Changed by |
1167 |
562 |
48.2 |
* Design Equivalent Standard Axles to reach unacceptable permanent deformation.
Table 4
Shoulder information requirements checked in the Road Asset and Maintenance Management database
Shoulder table information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Notes |
1003 |
988 |
98.5 |
Changed by |
1003 |
477 |
47.6 |
Table 5
Minor structure information requirements checked in the Road Asset and Maintenance Management database
Minor structure information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Subtype data |
724 |
4 |
0.6 |
Dimensional information |
724 |
235 |
32.5 |
Style entry |
724 |
683 |
94.3 |
Notes entry |
724 |
521 |
72.0 |
Collected by |
724 |
682 |
94.2 |
Collected on |
724 |
682 |
94.2 |
Material field |
724 |
12 |
1.7 |
Changed by |
724 |
25 |
3.4 |
Table 6
Retaining wall information requirements checked in the Road Asset and Maintenance Management database
Retaining wall information |
Total number checked |
Number of sections with information missing |
Percentage of sections with information missing |
Northing/Easting entries |
2042 |
1899 |
93.0 |
Length data |
2042 |
801 |
39.2 |
Average height data |
2042 |
203 |
9.9 |
Material |
2042 |
21 |
1.0 |
Data collected date |
2042 |
727 |
35.6 |
Data changed date |
2042 |
342 |
16.7 |
Data changed by |
2042 |
415 |
20.3 |
Table 7
Bridges checked in the Bridge Data System for the Northland, Auckland Motorway, Wellington, and Southland network management areas
Bridges |
Northland |
Auckland Motorway |
Wellington |
Southland |
Total |
Age information |
No. checked |
178 |
294 |
108 |
247 |
827 |
Data missing |
0 |
61 |
4 |
6 |
71 |
% of information missing |
0.0 |
20.7 |
3.7 |
2.4 |
8.6 |
Length information |
No. checked |
178 |
294 |
108 |
247 |
827 |
Data missing |
0 |
68 |
5 |
0 |
73 |
% of information missing |
0.0 |
23.1 |
4.6 |
0.0 |
8.8 |
Vertical clearance information* |
No. checked |
5 |
115 |
45 |
0 |
165 |
Data missing |
1 |
15 |
39 |
0 |
55 |
% of information missing |
20.0 |
13.04 |
86.66 |
0.0 |
33.3 |
Width information |
No. checked |
178 |
294 |
108 |
247 |
827 |
Data missing |
4 |
74 |
10 |
0 |
88 |
% of information missing |
2.2 |
25.2 |
9.3 |
0.0 |
10.6 |
Capacity/loading information |
No. checked |
178 |
294 |
108 |
247 |
827 |
Data missing |
176 |
275 |
46 |
132 |
629 |
% of information missing |
98.9 |
93.5 |
42.6 |
53.4 |
76.1 |
* We identified those bridges that are noted as crossing either a local road or a state highway and checked whether vertical clearance data was shown.
Table 8
Tunnels checked in the Bridge Data System for all network management areas
Tunnels |
Tunnels across the state highway network |
Age information |
No. checked |
16 |
Data missing |
9 |
% of information missing |
56.3 |
Length information |
No. checked |
16 |
Data missing |
4 |
% of information missing |
25.0 |
Height information |
No. checked |
16 |
Data missing |
7 |
% of information missing |
43.8 |
Width information |
No. checked |
16 |
Data missing |
8 |
% of information missing |
50.0 |
Table 9
Large culverts checked in the Bridge Data System in the Northland, Auckland Motorway, Wellington, and Southland network management areas
Large culverts |
Northland |
Auckland Motorway |
Wellington |
Southland |
Total |
Age information |
No. checked |
102 |
76 |
40 |
35 |
253 |
Data missing |
0 |
25 |
13 |
7 |
45 |
% of information missing |
0.0 |
32.9 |
32.5 |
20.0 |
17.8 |
Area information |
No. checked |
102 |
76 |
40 |
35 |
253 |
Data missing |
1 |
23 |
3 |
2 |
29 |
% of information missing |
0.9 |
30.3 |
7.5 |
5.7 |
11.5 |
Width information |
No. checked |
102 |
76 |
40 |
35 |
253 |
Data missing |
67 |
39 |
11 |
18 |
135 |
% of information missing |
65.7 |
51.3 |
27.5 |
51.4 |
53.4 |
Capacity/loading information |
No. checked |
102 |
76 |
40 |
35 |
253 |
Data missing |
0 |
53 |
21 |
12 |
86 |
% of information missing |
0.0 |
69.7 |
52.5 |
34.3 |
34.0 |
Table 10
Road Asset and Maintenance Management database monthly reporting checked (from June 2008 to June 2009) for the Northland, Auckland Motorway, Wellington, and Southland network management areas
|
Number of reports required |
Number of reports missing |
Number of incomplete reports |
Number of reports not signed by NZTA |
Northland |
12 |
0 |
0 |
12 |
Auckland Motorway |
12 |
1 |
2 |
5 |
Wellington |
12 |
0 |
0 |
12 |
Southland |
12 |
1 |
1 |
1 |
Total |
48 |
2 |
3 |
30 |
Table 11
Road Asset and Maintenance Management database milestone reporting checked (from June 2008 to June 2009) for the Northland, Auckland Motorway, Wellington, and Southland network management areas
|
Number of reports required |
Number of reports missing |
Number of incomplete reports |
Number of reports not signed by NZTA |
Northland |
3 |
0 |
0 |
0 |
Auckland Motorway |
3 |
1 |
2 |
1 |
Wellington |
3 |
0 |
0 |
3 |
Southland |
3 |
3 |
— |
— |
Total |
12 |
4 |
2 |
4 |
page top